North Bannister Waste Facility 

ClientPerth Waste Chainmesh

Perth Waste

Location

North Bannister Waste Facility WA

Duration

Southern Wire completed these works to a tight time frame of 6 weeks to meet the opening date of the new Waste Facility.

Scope of Works

Southern Wire manufactured, supplied and installed

  • 4000 Lineal metre of 1800mm high plus 3 rows of barb wire security fencing and gates
  • 400M Lineal metres of w-beam guard rail safety barrier
  • 150 Lineal metres of 5000mm high chainmesh litter fence